Showing posts with label cycle. Show all posts
Showing posts with label cycle. Show all posts

Thursday, February 17, 2011

HP0-M31 QC Certification Preparation 1 - Releases Module

1)      The Releases module is available for Quality Center Enterprise Edition and Quality Center Premier Edition.
2)      The foundation of the Releases module is the releases tree. This tree enables the modeling of upcoming releases within a hierarchical tree structure.
3)      A release represents a group of changes in one or more applications that will be available for distribution at the same time. After defining the release, you define cycles.
4)      A cycle is a set of development and quality assurance efforts performed to achieve a common goal based on the release timeline.
5)      After defining the releases tree, you define and review the requirements in the Requirements module and assign them to releases and cycles.
6)      Requirements describe in detail your application needs.
7)      Requirements are used as a basis for the test plan in the Test Plan module. The tests you create during the test plan phase should cover these requirements.
8)      After assigning requirements to releases and cycles, you assign each test set folder in the Test Lab module to a cycle.
9)      A test set is a group of test instances in a Quality Center project designed to achieve specific test goals.
10)   If an application flaw is detected while running a test set, you can submit a defect. Quality Center automatically creates a link between the test run, associated release and cycle, and the new defect.
11)   While reviewing and deciding which new defects need to be fixed, they can be assigned to the appropriate target release and cycle.
(Let us read more)