Thanks to Srinivas Chitrapu for sharing questions on quality center.
2) The phases of Test management withQuality Center in order are:
3) By creating a list of authorized users and assigning each user a password and user group, you control the kinds of additions and modifications each user makes to the project.
4) The .......determines the privileges that the user has within a project.
5) You can import data from Word or Excel to aQuality Center project.
6)Quality Center 9.2 prompts you to install Microsoft .NET ...... if it is not already installed on your machine.
7) When you connect to a project, theQuality Center main window opens and displays the module in which you were last working.
8) The can change and override a user.......s properties or password.
9) You can filterQuality Center data to display only those records that meet the criteria that you define. How many filters can you define?
10) In the test plan tree, you can define the ..............filter for associated test sets as”Open”.This ensures that only tests that belong to an open test set are displayed.
13) You can copy and paste the filter, sort, and group by settings to another project.
14) You can also share the settings (filter, sort, and group by settings) with another user by pasting them to an e-mail or a text file.
15) When you use text search, the search ignores
16) You can export the data in a grid as a
17) ....... alerting functions available inQuality Center
18) The alerting functions inQuality Center are:
19) You can create traceability links between.............. in the Requirements module.
20) You can associate a test instance with a defect. This is performed by creating ..............in the Test Plan module, or by adding a defect during a manual test run.
11) C, 12) A, 13) A, 14) B, 15) D, 16) E, 17) C, 18) A, 19) A, 20) B
22) A red flag indicates that the alert is.........
23) A gray flag indicates that the alert..............
24) A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.
25)Quality Center assigns the image a unique file name with a ..... Extension.
26) A ..............is a view of aQuality Center window with the settings you apply to it.
27) You save favorite views in ........
28) You can define the number of views displayed on the menu by setting the ............................ parameter in the Site Configuration tab in Site Administration.
29) The requirements specification workflow consists of the following:
30) Requirement topics are recorded in the Requirements module by creating a
21) D, 22) A, 23) B, 24) A, 25) D, 26) C, 27) D, 28) B, 29) A, 30) B
31) QA Manager changes a requirement from a .............. status to a Reviewed status once it is approved.
32) You can also import requirements to yourQuality Center project from Microsoft Word, Excel, or other third-party requirement management tools. To import requirements, you must first install the appropriate.....................
33) The Requirements Grid view enables you to display requirements in a ............................view.
34) The ............................view enables you to analyze the breakdown of child requirements according to test coverage status..
36) You can use the .....................to restrict and dynamically change the fields and values in the Requirements module.
37) The Requirements module enables you to define and manage your........
38) You can rename or delete Requirements root folder.
39) You can search for a particular requirement in the requirements tree or in the requirements grid using the .......command.
40) You can replace field values in the requirements tree or in the requirements grid using the .......command.
42) You can copy a requirement within the same project or between projects. Which of the below items are copied at the time of copying a requirement.
43) You can also move a requirement to a new location in the requirements tree by dragging it..
44) You can delete a requirement from the Requirements module. Deleting a requirement does not delete its child requirements, tests coverage, requirement traceability links, and defects linkage..
45) There are two methods you can use to create tests from requirements:
46) When analyzing the impact of a change proposed in a specific requirement, the traceability links indicate the other ...... that the change might affect.
47) ...... links indicate requirements that affect a selected requirement. .....links indicate requirements that are affected by a selected requirement.
48) When a requirement changes,Quality Center alerts the affected requirements. The alerts can be seen by.......
49) while Defining Traceability Relationships, You cannot add a requirement traceability link by dragging a requirement from the requirements tree to the appropriate grid..
50) While viewing Traceability Impact, the Impact Analysis tab helps you understand the many associations and dependencies that exist between the ........ by displaying them in a hierarchical tree structure.
52) Performing a risk-based quality management analysis for an analysis requirement involves the following steps
53) An ...... requirement is a requirement belonging to a type that represents higher levels in the requirements tree hierarchy, such as the Folder type.
55) For each assessment requirement under the analysis requirement, you determine the Risk Category. The Risk Category is composed of two factors.
56) The Business Criticality of a requirement has three possible values:.....
57) The Failure Probability of a requirement has three possible values:...
58)Quality Center defines four Testing Levels:.
59) The Business Criticality of a requirement is a measure of how likely a test on the requirement is to fail, based on the technical complexity of the requirement.......™s implementation, without consideration of the requirement.......™s impact on the business.
60) The Failure Probability of a requirement is a measure of how important the requirement is to your business
51) A, 52) D, 53) A, 54) B, 55) C, 56) A, 57) C, 58) B, 59) B, 60) B
62) A good test plan enables you to assess the quality of your application ....... in the testing process.
63) Which of the item is not a part of "Developing a test plan" in QC.
64) You can access the Test Plan menu bar from the Test Plan module by pressing the shortcut key .....
65) To find a specific test by Test ID in the Test Grid, choose ......, and enter the test ID
66) In relation to a test plan module, You can add user-defined fields and change the label of any of the fields in the Test Grid
67) You can use the ..... to restrict and dynamically change the fields and values in the Test Grid.
68) The typical application is too large to test as a whole. The Test Plan module enables you to divide your application according to ........
69) During the testing process, you may need to modify your test plan. You can update the test plan tree ......
70) Developing and editing a test plan tree requires appropriate user ......
61) A, 62) C, 63) D, 64) B, 65) A, 66) A, 67) B, 68) A, 69) C, 70) C
72) You can change the label of any of the test detail fields.
73) A question mark icon in the test plan tree indicates that the QuickTest Professional add-in is ....... on your machine.
74) A ...... link is included in the e-mail, enabling the recipient to go directly to the test.
76) Alternatively, in the Requirements module, you create ...... by selecting tests to link to a requirement.
77) A test can cover more than one requirement, and a requirement can be covered by only one test.
78) You can also create coverage between test instances and requirements. You can enable this feature using the ........... parameter in Site Administration
79) Requirements coverage is created automatically when you convert a requirement to a test. Therefore, even if you have not yet added
80) You can also define requirements coverage by dragging a requirement in the requirements tree to the coverage grid. The requirement is added to the coverage grid without its child requirements.
71) A, 72) A, 73) B, 74) C, 75) B, 76) C, 77) B, 78) A, 79) A, 80)
81) Test coverage is created automatically when you generate a requirement from a test.
82) In the Requirements module, you can use the ........ view to examine the status of your requirements.
83) By default, coverage is available only for the following requirement types: ......
84) You can create design steps for ..........
85) To increase the flexibility and power of a test, you can add ........to the called test and to the tests that call it.
86) You do not need to set a test as a template test to be able to call it or to add parameters. Marking a test as a template test is used for filtering purposes only.
87) If you do not assign values to parameters when creating a test call, you are prompted to do so when you call this test from another test, when you add your test to a test set, or when you run your test.
88) You can navigate between steps in the Design Step Editor using shortcut keys. Use ...... to access the first step.
89) While generating automated test scripts, what does WR-AUTOMATED automated test type means.
90) To run a system test, you must install the System Execute Remote Agent Add-in and the HP Quality Center Connectivity Add-in on the machine where the test is to be run.
81) B, 82) A, 83) B, 84) D, 85) C, 86) A, 87) A, 88) C, 89) B, 90) B
92) You can access the Test Lab menu bar from the Test Lab module by pressing the shortcut key......
93) The Test Lab module includes the following toolbars:
94) In the Test Lab Module, in Execution Grid Columns, the column Exec Date means
95) You can add user-defined fields and change the label of any of the fields in the Execution Grid.
96) You can organize test execution by creating ........
97) While creating test sets, after you design tests in the Test Plan module, you create a ..........
98) By default, the uppermost level in a test sets tree is the ..........
99) You can also use the ............. in the Test Instance Properties dialog box (Changing the Default Failure Rules for Specific Tests) to set the on failure rules for a test in a test set.
100) You can also drag the test sets between lists.
91) C, 92) D, 93) A, 94) B, 95) A, 96) D, 97) A, 98) D, 99) A, 100) A
108)To run several test sets concurrently on multiple remote hosts, open a new Automatic Runner dialog box instance for each test set.
116)To find a specific defect by Defect ID in the Defects Grid, choose ....
A) Defects > Defect B) Defects > Move To Defect
C) Defects > Set Defect D) Defects > Go To Defect
117)Each line in the Defects Grid displays a separate defect record.
A) True B) False
118)You cannot add user-defined fields and change the label of any of the fields in the Defects Grid.
A) True B) False
119)You can use the ......... to restrict and dynamically change the fields and values in the Defects Grid.
A) Scripting Editor B) Notepad Editor C) QC Editor D) Script Editor
120)You can link defects to other Quality Center entities, such as requirements, tests and other defects.
A) True B) False
111) C 112) A 113) A 114) C 115) C 116) D 117) A 118) B 119) D 120) A
141)You can define a logo for the project document, and save the image so that it is available for other users in the current project. If you do not select an image, the Document Generator uses the Mercury logo in the project document.
146)You can generate Excel reports that enable you to exportQuality Center data to Microsoft Excel and analyze the data from within Excel.
A) True B) False
147)You can exportQuality Center data to Microsoft Excel. You cannot create a report with parameters.
A) True B) False
148)Most of the Excel Reports functionality is unavailable if you belong to a user group that has the necessary permissions.
A) True B) False
149)After you have added a report to the Excel Reports tree, you must define which project data you want to include in the report. You define this data by creating .... to extract the data.
A) Test Queries B) Lotus Queries C) Excel Macros D) SQL queries
150)To view the database type used for your project database, click the... button.
A) Database in use B) Database Type C) Get Database D) Database version
141) B , 142) C , 143) D, 144) D , 145) B , 146) A , 147) B , 148) B , 149) D , 150) B
1)You accessQuality Center over the ......, via a Web browser.
6)You can import data from...... to aQuality Center project.
A) Word or Notepad B) Word or Wordpad
C) Word or Excel D) Word or Power Point
7)You launch Quality Center on your machine from your Web browser.
A) True B) False
8)Quality Center prompts you to install ...... if it is not already installed on your machine.
A) Microsoft Java 2.0 B) Microsoft Visio 13.0
C) Microsoft Visual studio 2.0 D) Microsoft .NET Framework 2.0
9)Quality Center has the following modules, which are accessible from the sidebar:
A) Releases, Requirements, Test Plan, Test Lab, Defects, Analysis
B) Releases, Requirements, Test Plan, Test Lab, Defects, Business Components
C) Releases, Requirements, Test Plan, Test Lab, Defects, Analysis
D) Releases, Requirements, Test Plan, Test Lab, Defects
10)When you customize your project, you can instruct Quality Center to preserve a log of values for the system and user fields in your Requirement, Test, Test Set, Test Instance, and Defect entities.
A) True B) False
11)The ..... can send messages to users connected toQuality Center projects informing them about important maintenance or other issues.
A) site administer B) site Controller
C) site Analyser D) site administrator
12)Quality Center organizes and displays data in ......:
A) grids B) trees C) Folders D) Both A & B
13)You can no longer customize data by specifying the order in which columns appear,and by changing column size.
A) True B) False
14)You can filterQuality Center data to display only those records that meet
the criteria that you define.
A) True B) False
15)When defining a filter, you can also include a cross filter. This is an advanced
....... on an associated item such as requirements, tests, test sets, or
defects.
A) Secondary filter B) Primary filter
C) cross filter D) Second filter
16)By default, records appear inQuality Center according to the ....
A) Increasing order B) Decreasing order
C) order in which they were added. D) order in which they were deleted.
17)You cannot copy and paste the filter, sort, and group by settings to and from the
Clipboard.
A) True B) False
18)You can use text search to search for records in predefined fields of the ........
A) Requirements, Test Plan, and Defects modules.
B) Releases, Test Plan, and Defects modules.
C) Requirements and Defects modules.
D) Requirements, Execute Tests, and Defects modules.
19)If you have defined filter conditions for a module, you can restrict the search to the filtered records, or you can search all records in the module
A) True B) False
20)Text search is only available if it has been enabled for the project.
A) True B) False
21)You can export the data in a grid as a ......
A) text file, Microsoft Excel, Microsoft Word, or HTML document.
B) text file, Microsoft Excel, Microsoft Word
C) text file, Microsoft Excel, or HTML document.
D) Microsoft Excel, Microsoft Word, or HTML document.
22)When a requirement, test, or defect changes,Quality Center alerts the associated entities and can notify those responsible for any associated entities.
A) True B) False
23)A ..... indicates that the alert is new. A gray flag indicates that the alert has already been read.
A) Green flag B) Pink flag
C) red flag D) Blue flag
24)Quality Center enables you to add your own alerts, in addition to automatic traceability notifications. You can use ..... flags to remind yourself to follow up on something.
A) Alert Me B) follow up C) follow Me D) follow
25)Throughout the testing process, you can add attachments to help illustrate your work.
A) True B) False
26)You can use a Uniform Resource Locator (URL) to aQuality Center record as an attachment.
A) True B) False
27)A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.
A) True B) False
28)A ....... is a view of aQuality Center window with the settings you apply to it.
A) Personal view B) My view
C) favorite view D) fav view
29)By default, Quality Center displays the four most recently used views on the Favorites menu. You can define the number of views displayed on the menu by setting the ....... parameter in the Site Configuration tab in Site Administration.
A) FAVORITES_DEPTH B) FAVORITES-DEPTH
C) FAVORITE_DEPTH D) FAVORITE_DEPTHS
30)You save favorite views in either a .... folder or a ..... folder. Views in a
.... folder are accessible to all users. Views in a ..... folder are accessible only to the user who created them.
A) public, private, public, private B) Root, Base, Root, Base,
C) locked, unlocked, locked, unlocked D) Both B & C
1) D , 2) A , 3) B, 4) B , 5) D , 6) C , 7) A , 8) D , 9) B , 10) A, 11) D , 12) D, 13) B, 14) A, 15) C, 16) C, 17 B, 18) A, 19) A, 20) A, 21) A, 22) A, 23) C, 24) B, 25) A, 26) A, 27) A, 28) C, 29) A, 30) A
1)You begin the application testing process by defining a releases tree in the.......
14) You can move a release folder or a release to a different location in the releases tree.
A) True B) False
15) The Releases root folder can also be moved.
A) True B) False
16) You can create a duplicate of a cycle within the same release.
A) True B) False
17) Deleting a release folder, release, or cycle, does not unassigns the associated requirements, test set folders, and defects.
A) True B) False
18) You can also move a release folder or a release to a new location in the releases tree by dragging it.
A) True B) False
1) B , 2) A , 3) B, 4) A , 5) D , 6) B , 7) B , 8) A , 9) A , 10) B, 11) B , 12) D, 13) B, 14) A, 15) B, 16) A, 17 B, 18) A
Requirements Specification
1) A , 2) B , 3) D, 4) A , 5) B , 6) C , 7) A , 8) D , 9) B , 10) D, 11) A , 12) B, 13) C, 14) C, 15) D, 16) A, 17 A, 18) A, 19 A), 20) B,21) B,22) A,23) B,24) A ,25) D ,26) A,27) A,28) B,29) C, 30) A, 31) B, 32) C
1) Test management with Quality Center involves....... Phases.
A) Four B) Five C) Six D) Seven
2) The phases of Test management with
A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects
B) Specify Requirements, Specify Releases, Plan Tests, Execute Tests, Track Defects
C) Specify Requirements, Plan Tests, Specify Releases, Execute Tests, Track Defects
D) Specify Releases, Specify Requirements, Plan Tests, Track Defects, Execute Tests
B) Specify Requirements, Specify Releases, Plan Tests, Execute Tests, Track Defects
C) Specify Requirements, Plan Tests, Specify Releases, Execute Tests, Track Defects
D) Specify Releases, Specify Requirements, Plan Tests, Track Defects, Execute Tests
3) By creating a list of authorized users and assigning each user a password and user group, you control the kinds of additions and modifications each user makes to the project.
A) True B) False
4) The .......determines the privileges that the user has within a project.
A) User ID B) User Name C) User group D) User SID
5) You can import data from Word or Excel to a
A) True B) False
6)
A) Framework 2.0 B) Framework 1.0
C) Framework 3.0 D) Framework 4.0
C) Framework 3.0 D) Framework 4.0
7) When you connect to a project, the
A) True B) False
8) The can change and override a user.......s properties or password.
A) Global Administrator B) Site Administrator
C) Administrator D) QC Administrator
C) Administrator D) QC Administrator
9) You can filter
A) Single item as a filter B) Two items as a filter
C) Multiple items as filter D) Five items as filter
C) Multiple items as filter D) Five items as filter
10) In the test plan tree, you can define the ..............filter for associated test sets as”Open”.This ensures that only tests that belong to an open test set are displayed.
A) Double B) Twice C) Cross D) Multiple
1) B, 2) A, 3) A, 4) C, 5) A, 6) A, 7) A, 8) B, 9) C, 10) C
1) B, 2) A, 3) A, 4) C, 5) A, 6) A, 7) A, 8) B, 9) C, 10) C
More
11) By default, records appear in Quality Center in the
A) Increasing Order B) Decreasing Order
C) Order in which they were added D) None of these
C) Order in which they were added D) None of these
12) You can save filter and sort information as a favorite view and then load it as needed.
A) True B) False
13) You can copy and paste the filter, sort, and group by settings to another project.
A) True B) False
14) You can also share the settings (filter, sort, and group by settings) with another user by pasting them to an e-mail or a text file.
A) True B) False
15) When you use text search, the search ignores
A) articles (a, an, the)
B) Coordinate conjunctions (and, but, for, nor, or);
C) Boolean operators (and, or, not, if, or, then).
D) All of above
C) Boolean operators (and, or, not, if, or, then).
D) All of above
16) You can export the data in a grid as a
A) Text files, B) Microsoft Excel worksheet,
C) Microsoft Word document or D) HTML document. E) All of above
17) ....... alerting functions available in
A) Three B) Four C) Two D) Five
18) The alerting functions in
A) Automatic notification alerts, Follow up alerts
B) Email alerts, Automatic notification alerts, Follow up alerts
C) Defect alerts, Email alerts, Automatic notification alerts, Follow up alerts
D) Final alerts, Email alerts, Automatic notification alerts, Follow up alerts
B) Email alerts, Automatic notification alerts, Follow up alerts
C) Defect alerts, Email alerts, Automatic notification alerts, Follow up alerts
D) Final alerts, Email alerts, Automatic notification alerts, Follow up alerts
19) You can create traceability links between.............. in the Requirements module.
A) Requirements B) Test Cases C) Tests D) Defects
20) You can associate a test instance with a defect. This is performed by creating ..............in the Test Plan module, or by adding a defect during a manual test run.
A) Linked Tests B) Linked Defects C) Linked Errors D) Linked Data
11) C, 12) A, 13) A, 14) B, 15) D, 16) E, 17) C, 18) A, 19) A, 20) B
21) You can view a list of alerts for a ............................ entity.
A) A test in the test plan tree or Test Grid
B) A test instance in the Execution Grid
C) None of above
D) Both A) & B)
B) A test instance in the Execution Grid
C) None of above
D) Both A) & B)
22) A red flag indicates that the alert is.........
A) New B) Old C) Follow up D) Urgent
23) A gray flag indicates that the alert..............
A) New B) has already been read C) Follow up D) Urgent
24) A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.
A) True B) False
25)
A) .jpeg B) .gif C) .doc D) .jpg
26) A ..............is a view of a
A) Personal View B) My view C) Favorite View D) My QC View
27) You save favorite views in ........
A) Favorite folder B) Personal folder
C) Both A & B D) Public & Private folder
28) You can define the number of views displayed on the menu by setting the ............................ parameter in the Site Configuration tab in Site Administration.
A) favorites B) favorites_Depth C) favorites_view D) favorites_Path
29) The requirements specification workflow consists of the following:
A) Define Testing Scope, Create Requirements, Detail Requirements, Assign to Releases, Analyze Requirements
B) Define Testing Scope, Detail Requirements, Create Requirements, Assign to Releases, Analyze Requirements
C) Define Testing Scope, Create Requirements, Detail Requirements, Analyze Requirements, Assign to Releases
D) Define Testing Scope, Create Requirements, Analyze Requirements, Detail Requirements, Assign to Releases
B) Define Testing Scope, Detail Requirements, Create Requirements, Assign to Releases, Analyze Requirements
C) Define Testing Scope, Create Requirements, Detail Requirements, Analyze Requirements, Assign to Releases
D) Define Testing Scope, Create Requirements, Analyze Requirements, Detail Requirements, Assign to Releases
30) Requirement topics are recorded in the Requirements module by creating a
A) Requirements cycle B) Requirements tree
C) Requirements plan D) Requirements module
C) Requirements plan D) Requirements module
21) D, 22) A, 23) B, 24) A, 25) D, 26) C, 27) D, 28) B, 29) A, 30) B
31) QA Manager changes a requirement from a .............. status to a Reviewed status once it is approved.
A) Released B) Tested C) Not reviewed D) None of these
32) You can also import requirements to your
A) HP Third Party add-in. B) HP Quality Center add-in.
C) HP Quality Center D) HP Quality Center License
C) HP Quality Center D) HP Quality Center License
33) The Requirements Grid view enables you to display requirements in a ............................view.
A) Flat B) Hierarchical C) Flat-hierarchical D) Flat non-hierarchical
34) The ............................view enables you to analyze the breakdown of child requirements according to test coverage status..
A) Coverage Analysis B) Coverage Requirements
C) Coverage D) Coverage Tests
C) Coverage D) Coverage Tests
35) You can access the Requirements menu bar from the Requirements module by pressing the shortcut key .......
A) F1 B) F9 C) Ctrl + R D) Alt + R
36) You can use the .....................to restrict and dynamically change the fields and values in the Requirements module.
A) Script Edit B) Scriptor Editor C) Script Editor D) Script Editing
37) The Requirements module enables you to define and manage your........
A) requirements B) All requirements
C) some requirements D) Tedious requirements
38) You can rename or delete Requirements root folder.
A) true B) False
39) You can search for a particular requirement in the requirements tree or in the requirements grid using the .......command.
A) Search B) Find C) Search All D) Find All
40) You can replace field values in the requirements tree or in the requirements grid using the .......command.
A) Replace B) Replace All C) Find & Replace D) Replace & Find
31) C, 32) B, 33) D, 34) A, 35) B, 36) C, 37) A, 38) B, 39) B, 40) A
41) By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the ....... parameter in the Site Configuration tab in Site Administration.
A) EMAIL_FORMAT B) EMAIL_FORM
C) MAIL_FORMAT D) QC_MAIL_FORMAT
42) You can copy a requirement within the same project or between projects. Which of the below items are copied at the time of copying a requirement.
A) Test coverage. B) defect linkage.
C) risk-based quality management data D) All of above E) None of above
C) risk-based quality management data D) All of above E) None of above
43) You can also move a requirement to a new location in the requirements tree by dragging it..
A) True B) False
44) You can delete a requirement from the Requirements module. Deleting a requirement does not delete its child requirements, tests coverage, requirement traceability links, and defects linkage..
A)True B) False
45) There are two methods you can use to create tests from requirements:
A) Convert Requirements to Tests & Generate a Test from Requirements
B) Convert Requirements to Tests & Convert a Test from Requirements
C) Convert Requirements to Tests & Generate a Requirement from Tests
D) Convert a Test from Requirements & Generate Requirements to Tests
B) Convert Requirements to Tests & Convert a Test from Requirements
C) Convert Requirements to Tests & Generate a Requirement from Tests
D) Convert a Test from Requirements & Generate Requirements to Tests
46) When analyzing the impact of a change proposed in a specific requirement, the traceability links indicate the other ...... that the change might affect.
A) tests B) requirements C) tests & requirements D) None
47) ...... links indicate requirements that affect a selected requirement. .....links indicate requirements that are affected by a selected requirement.
A) Trace from, Trace to B) Trace to, Trace from
C) From trace, To trace D) None of above
C) From trace, To trace D) None of above
48) When a requirement changes,
A) Author of the requirement
B) users authorized by the Author of the requirement
C) all users D) Administrator
C) all users D) Administrator
49) while Defining Traceability Relationships, You cannot add a requirement traceability link by dragging a requirement from the requirements tree to the appropriate grid..
A) True B) False
50) While viewing Traceability Impact, the Impact Analysis tab helps you understand the many associations and dependencies that exist between the ........ by displaying them in a hierarchical tree structure.
A) Tests B) Requirements
C) Both D) None
C) Both D) None
41) C, 42) E, 43) A, 44) B, 45) A, 46) B, 47) A, 48) C, 49) B, 50) B
51) Each requirement type with risk-based quality management enabled supports either.
A) risk analysis or risk assessment B) risk breakdown or risk assessment
C) risk breakdown or risk review D) risk analysis or risk evaluation
52) Performing a risk-based quality management analysis for an analysis requirement involves the following steps
A) Determine Risk groups, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
B) Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy
C) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy
D) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
B) Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy
C) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy
D) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
53) An ...... requirement is a requirement belonging to a type that represents higher levels in the requirements tree hierarchy, such as the Folder type.
A) analysis B) assessment C) Policy D) Test
54) An ....... requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.
54) An ....... requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.
A) analysis B) assessment C) Policy D) Test
55) For each assessment requirement under the analysis requirement, you determine the Risk Category. The Risk Category is composed of two factors.
A) Business Probability and Failure Criticality B) Business Vitality and Failure Probability C) Business Criticality and Failure Probability
D) Business Criticality and Failure Possibility
D) Business Criticality and Failure Possibility
56) The Business Criticality of a requirement has three possible values:.....
A) Critical, Important, Nice to Have B) Critical, Importance, Nice to Have
C) Critical, Important, Nice to Had D) None of these
C) Critical, Important, Nice to Had D) None of these
57) The Failure Probability of a requirement has three possible values:...
A) High, Standard, Low B) High, Average, Low
C) High, Medium, Low D) None of these
C) High, Medium, Low D) None of these
58)
A) Full, Partial, Basic, and Low B) Full, Partial, Basic, and None
C) Full, Half, Basic, and None D) Full, Partial, Critical, and None
C) Full, Half, Basic, and None D) Full, Partial, Critical, and None
59) The Business Criticality of a requirement is a measure of how likely a test on the requirement is to fail, based on the technical complexity of the requirement.......™s implementation, without consideration of the requirement.......™s impact on the business.
A) True B) False
60) The Failure Probability of a requirement is a measure of how important the requirement is to your business
A) True B) False
51) A, 52) D, 53) A, 54) B, 55) C, 56) A, 57) C, 58) B, 59) B, 60) B
61) During Requirement Risks calculation, the ..... displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis
A) missing assessment link B) missing assessment field
C) missing assessment value D) missing assessment relation
C) missing assessment value D) missing assessment relation
62) A good test plan enables you to assess the quality of your application ....... in the testing process.
A) at the beginning B) at the end C) at the point D) at the middle
63) Which of the item is not a part of "Developing a test plan" in QC.
A) Design Test Steps B) Design Tests
C) Automate Tests D) Define Testing Policy Settings
C) Automate Tests D) Define Testing Policy Settings
64) You can access the Test Plan menu bar from the Test Plan module by pressing the shortcut key .....
A) F7 B) F9 C) F12 D) F11
65) To find a specific test by Test ID in the Test Grid, choose ......, and enter the test ID
A) Test > Go to Test B) Test > find Test
C) Test > search Test D) Test > link Test
C) Test > search Test D) Test > link Test
66) In relation to a test plan module, You can add user-defined fields and change the label of any of the fields in the Test Grid
A) True, B) False
67) You can use the ..... to restrict and dynamically change the fields and values in the Test Grid.
A) text editor B) script editor C) scriptor editor D) scripts editor
68) The typical application is too large to test as a whole. The Test Plan module enables you to divide your application according to ........
A) functionality B) requirements C) test plans D) test modules
69) During the testing process, you may need to modify your test plan. You can update the test plan tree ......
A) at the beginning B) at the end C) at any time D) in the middle
70) Developing and editing a test plan tree requires appropriate user ......
A) IDs B) requirements C) permissions D) passwords
61) A, 62) C, 63) D, 64) B, 65) A, 66) A, 67) B, 68) A, 69) C, 70) C
71) To set a Quick Test Professional test as a template test, right-click the test in the test plan tree, and choose ......
A) Template Test B) Template Tree C) Template Plan D) Template
72) You can change the label of any of the test detail fields.
A) True B) False
73) A question mark icon in the test plan tree indicates that the QuickTest Professional add-in is ....... on your machine.
A) not activated B) not installed C) not enabled D) not set
74) A ...... link is included in the e-mail, enabling the recipient to go directly to the test.
A) Link To Test B) Move To Test C) Go To Test D) Test
75) In the Test Plan module, you create ....... by selecting requirements to link to a test.
75) In the Test Plan module, you create ....... by selecting requirements to link to a test.
A) RTM B) requirements coverage C) test coverage D) SRS
76) Alternatively, in the Requirements module, you create ...... by selecting tests to link to a requirement.
A) RTM B) requirements coverage C) test coverage D) SRS
77) A test can cover more than one requirement, and a requirement can be covered by only one test.
A) True B) False
78) You can also create coverage between test instances and requirements. You can enable this feature using the ........... parameter in Site Administration
A) ALLOW_REQ_COVERAGE_BY_TEST_INSTANCE
B) ALLOW_TEST_COVERAGE_BY_REQ_INSTANCE
C) ALLOW_R_COVERAGE_BY_T_INSTANCE
D) None of above
B) ALLOW_TEST_COVERAGE_BY_REQ_INSTANCE
C) ALLOW_R_COVERAGE_BY_T_INSTANCE
D) None of above
79) Requirements coverage is created automatically when you convert a requirement to a test. Therefore, even if you have not yet added
requirements coverage, it may already exist.
A) True B) False
80) You can also define requirements coverage by dragging a requirement in the requirements tree to the coverage grid. The requirement is added to the coverage grid without its child requirements.
A) True B) False
71) A, 72) A, 73) B, 74) C, 75) B, 76) C, 77) B, 78) A, 79) A, 80)
81) Test coverage is created automatically when you generate a requirement from a test.
A) True B) False
82) In the Requirements module, you can use the ........ view to examine the status of your requirements.
A) Coverage Analysis B) Coverage Breakdown
C) Requirements Status D) Coverage Status
C) Requirements Status D) Coverage Status
83) By default, coverage is available only for the following requirement types: ......
A) Functional, Testing, and Defined.
B) Functional, Testing, and Undefined.
C) Functional, System, and Undefined.
D) Functional, Review, and Undefined.
B) Functional, Testing, and Undefined.
C) Functional, System, and Undefined.
D) Functional, Review, and Undefined.
84) You can create design steps for ..........
A) manual and B) automated tests C) SRS D) Both A and B
85) To increase the flexibility and power of a test, you can add ........to the called test and to the tests that call it.
A) Input Values B) Output Values C) Parameters D) None of above
86) You do not need to set a test as a template test to be able to call it or to add parameters. Marking a test as a template test is used for filtering purposes only.
A) True, B) False
87) If you do not assign values to parameters when creating a test call, you are prompted to do so when you call this test from another test, when you add your test to a test set, or when you run your test.
A) True B) False
88) You can navigate between steps in the Design Step Editor using shortcut keys. Use ...... to access the first step.
A) ALT+LEFT B) ALT+RIGHT C) ALT+HOME D) ALT+ UP
89) While generating automated test scripts, what does WR-AUTOMATED automated test type means.
A) A test that is created by Winrunner
B) A test that is executed by Winrunner
C) A test that is deleted by Winrunner
D) None of above
B) A test that is executed by Winrunner
C) A test that is deleted by Winrunner
D) None of above
90) To run a system test, you must install the System Execute Remote Agent Add-in and the HP Quality Center Connectivity Add-in on the machine where the test is to be run.
A) True B) False
81) B, 82) A, 83) B, 84) D, 85) C, 86) A, 87) A, 88) C, 89) B, 90) B
91) Using Quality Center Test Lab module, executing tests also consists of ....
A) Run Tests Automatically B) Run Tests Manually
C) Both A and B D) None of above
C) Both A and B D) None of above
92) You can access the Test Lab menu bar from the Test Lab module by pressing the shortcut key......
A) F6 B) F7 C) F8 D) F9
93) The Test Lab module includes the following toolbars:
A) Test Set and Select Tests B) Test Select and Set Tests
C) Set Test and Tests Select D) None of above
C) Set Test and Tests Select D) None of above
94) In the Test Lab Module, in Execution Grid Columns, the column Exec Date means
A) The date on which the test was first executed.
B) The date on which the test was last executed
C) The date on which the test was executed
D) The date on which the test will be executed in future
B) The date on which the test was last executed
C) The date on which the test was executed
D) The date on which the test will be executed in future
95) You can add user-defined fields and change the label of any of the fields in the Execution Grid.
A) True B) False
96) You can organize test execution by creating ........
A) test modules B) test flows C) test beds D) test sets
97) While creating test sets, after you design tests in the Test Plan module, you create a ..........
A) test sets tree B) test sets flow C) test sets grid D) test sets rows
98) By default, the uppermost level in a test sets tree is the ..........
A) Level 0 folder B) Top folder C) Highest level folder D) Root folder
99) You can also use the ............. in the Test Instance Properties dialog box (Changing the Default Failure Rules for Specific Tests) to set the on failure rules for a test in a test set.
A) Run Events view B) Run Events Grid C) Run Events menu D) Run Eventsmodul e
100) You can also drag the test sets between lists.
A) True B) False
91) C, 92) D, 93) A, 94) B, 95) A, 96) D, 97) A, 98) D, 99) A, 100) A
101)The Execution Flow tab enables you to watch the execution process as it happens and to control the way your tests are executed.
A) True B) False
A) True B) False
102)In the Execution Flow, a dashed line -- -- -> arrow indicates that the test
A) is to be executed after the previous test, with no conditions.
B) is to be executed only if the previous test has status Finished
C) is to be executed only if the previous test has status Passed D) None
103)You can delete a ....execution condition(s) connected to a test.
A) Single B) Two C) Three D) All
104)When we Run a test, in the Manual Test Run window, by default which option is selected
A) Manual Runner (Run according to the order in the Execute Grid)
B) Manual Runner (Run according to the order in then Executing Grid)
C) Manual Runner (Run according to the order in the Execution Grid)
D) Manual Runner (Run according to the order in the Execution Grind)
105)You can assign multiple values to a parameter during a test run.
A) True B) False
106)If a manual test run was paused during execution, you can continue the run at a later stage.
A) True B) False
107)You can run tests automatically on ......
A) Your machine B) Remote Hosts C) Both A & B D) None
A) is to be executed after the previous test, with no conditions.
B) is to be executed only if the previous test has status Finished
C) is to be executed only if the previous test has status Passed D) None
103)You can delete a ....execution condition(s) connected to a test.
A) Single B) Two C) Three D) All
104)When we Run a test, in the Manual Test Run window, by default which option is selected
A) Manual Runner (Run according to the order in the Execute Grid)
B) Manual Runner (Run according to the order in then Executing Grid)
C) Manual Runner (Run according to the order in the Execution Grid)
D) Manual Runner (Run according to the order in the Execution Grind)
105)You can assign multiple values to a parameter during a test run.
A) True B) False
106)If a manual test run was paused during execution, you can continue the run at a later stage.
A) True B) False
107)You can run tests automatically on ......
A) Your machine B) Remote Hosts C) Both A & B D) None
108)To run several test sets concurrently on multiple remote hosts, open a new Automatic Runner dialog box instance for each test set.
A) Auto Runner B) Automate Runner
C) Automatic Runner D) Manual Runner
109)When you run QuickTest Professional tests from the Test Lab module, they are automatically run in Fast mode. They cannot be run inNormal mode.
A) True B) False
110)You can only view the Execution Log even if you did not select Enable Log in the Automatic Runner dialog box before you executed the test.
A) True B) False
101) A 102) A 103) D 104) C 105) B 106) A 107) C 108) C 109) A 110) B
C) Automatic Runner D) Manual Runner
109)When you run QuickTest Professional tests from the Test Lab module, they are automatically run in Fast mode. They cannot be run in
A) True B) False
110)You can only view the Execution Log even if you did not select Enable Log in the Automatic Runner dialog box before you executed the test.
A) True B) False
101) A 102) A 103) D 104) C 105) B 106) A 107) C 108) C 109) A 110) B
111)You can view the test results from the ...........
A) Test Instance dialog box. B) Test Properties dialog box
C) Test Instance Properties dialog box D) None
112)The Linked Defects view on the sidebar of Test Instance Properties dialog box displays:
A) linked defects and requirements coverage for a test instance
B) only linked defects for a test instance
C) linked defects and history for a test instance
D) linked defects and test results for a test instance
113)Quality Center enables you to compare the results of a test run with the results of previous runs.
A) True B) False
114)In the Test Instance Properties dialog box, You can view and edit the On Failure rules for an automated test instance using the ..... view.
A) Automated B) Details C) Run Events D) Both A & C
115)You track defects in the Quality Center Defects module, which you open by clicking the ...... button on the sidebar.
A) Test Instance dialog box. B) Test Properties dialog box
C) Test Instance Properties dialog box D) None
112)The Linked Defects view on the sidebar of Test Instance Properties dialog box displays:
A) linked defects and requirements coverage for a test instance
B) only linked defects for a test instance
C) linked defects and history for a test instance
D) linked defects and test results for a test instance
113)Quality Center enables you to compare the results of a test run with the results of previous runs.
A) True B) False
114)In the Test Instance Properties dialog box, You can view and edit the On Failure rules for an automated test instance using the ..... view.
A) Automated B) Details C) Run Events D) Both A & C
115)You track defects in the Quality Center Defects module, which you open by clicking the ...... button on the sidebar.
A) Track Defects B) Open Defects C) Defects D) Log Defects
116)To find a specific defect by Defect ID in the Defects Grid, choose ....
A) Defects > Defect B) Defects > Move To Defect
C) Defects > Set Defect D) Defects > Go To Defect
117)Each line in the Defects Grid displays a separate defect record.
A) True B) False
118)You cannot add user-defined fields and change the label of any of the fields in the Defects Grid.
A) True B) False
119)You can use the ......... to restrict and dynamically change the fields and values in the Defects Grid.
A) Scripting Editor B) Notepad Editor C) QC Editor D) Script Editor
120)You can link defects to other Quality Center entities, such as requirements, tests and other defects.
A) True B) False
111) C 112) A 113) A 114) C 115) C 116) D 117) A 118) B 119) D 120) A
121)You can add a new defect to a Quality Center project from any module at any stage of the testing process.
A) True B) False
122)There are two methods you can use to conduct a search for similar/related defects:
A) Find parallel Defects & Find parallel Text.
B) Find related Defects & Find related Text.
C) Find Similar Defects & Find Similar Text.
D) Find all Defects & Find all Text.
123)You can update defects directly in the ......, or in the ..... dialog box.
A) Defects Grid B) Defects Detail C) Defects Module
A) True B) False
122)There are two methods you can use to conduct a search for similar/related defects:
A) Find parallel Defects & Find parallel Text.
B) Find related Defects & Find related Text.
C) Find Similar Defects & Find Similar Text.
D) Find all Defects & Find all Text.
123)You can update defects directly in the ......, or in the ..... dialog box.
A) Defects Grid B) Defects Detail C) Defects Module
D) Both A & B E) Both B & C
124)You can only see changes made to a defect for selected fields predefined by the project administrator in Project Customization.
A) True B) False
125)By default,Quality Center sends e-mail in HTML format. To send
e-mail as plain text instead, edit the parameter in the Site Configuration tab in Site Administration
A) M_FORMAT B) MAIL_FORMAT_ID C) MAIL_FORM D) MAIL_FORMAT
124)You can only see changes made to a defect for selected fields predefined by the project administrator in Project Customization.
A) True B) False
125)By default,
e-mail as plain text instead, edit the parameter in the Site Configuration tab in Site Administration
A) M_FORMAT B) MAIL_FORMAT_ID C) MAIL_FORM D) MAIL_FORMAT
126)You can link a defect to the run steps and other defects.
A) True B) False
A) True B) False
127)You can only remove direct links from the Linked Defects grid. Indirect links are removed automatically when the direct links are removed.
A) True B) False
128)Quality Center reports can be generated from the
A) Requirements,Test Plan,Test Lab,Defects modules.
B) Requirements,Test Plan,Defects modules.
C) Requirements & Test Plan modules.
D) Requirements,Test Plan,Test Lab modules.
129)You can export grid data as a text file, Microsoft Excel spreadsheet, Microsoft Word document, or HTML document. You export data from the
A) Requirements Grid & Defects Grid.
B) Requirements Grid,Execution Grid, or Defects Grid.
C) Requirements Grid, Test Grid, Execution Grid, or Defects Grid.
D) Requirements Grid, Test Grid, Execution Grid.
130)How many Reports (Not Sub-Reports) are available in Requirements module.
A) 5 B) 6 C) 7 D) 4
121) A 122) C 123) D 124) A 125) D 126) A 127) A 128) A 129) C 130) B
A) True B) False
128)
A) Requirements,Test Plan,Test Lab,Defects modules.
B) Requirements,Test Plan,Defects modules.
C) Requirements & Test Plan modules.
D) Requirements,Test Plan,Test Lab modules.
129)You can export grid data as a text file, Microsoft Excel spreadsheet, Microsoft Word document, or HTML document. You export data from the
A) Requirements Grid & Defects Grid.
B) Requirements Grid,Execution Grid, or Defects Grid.
C) Requirements Grid, Test Grid, Execution Grid, or Defects Grid.
D) Requirements Grid, Test Grid, Execution Grid.
130)How many Reports (Not Sub-Reports) are available in Requirements module.
A) 5 B) 6 C) 7 D) 4
121) A 122) C 123) D 124) A 125) D 126) A 127) A 128) A 129) C 130) B
131)Quality Center enables you to generate graphs from the .........
A) Requirements module B) Test Plan module
C) Test Lab module D) Defects module
E) Both A & C F) All of Above
132)Requirements -Summary Graph
A) Shows how many requirements accumulated in a Quality Center project at specific points during a period of time.
B) Shows the history of changes to specific requirement fields in aQuality Center project
C) Shows how many requirements are currently in aQuality Center project.
D) Shows how many tests are currently in aQuality Center project.
133)By default, the graph appears as a
A) pie chart, B) bar chart C) Pareto chart D) Both A & B
134)You can also use the Graph Wizard to guide you through the graph creation process.
A) True B) False
135)You can determine how information appears in the graph using the .....
A) graph toolbar. B) graph settings C) graph menu D) Both A & C
136)..... graphs enable you to create and display a dynamic graphical representation of data related to test plans and test sets.
A) Live Value B) Live Analysis C) Live Analytics D) Both A & C
137)You use Live Analysis graphs to view data that relates to a .... folder.
A) test subject B) test set C) test category D) Both A & B
138)The Live Analysis graphs that you create are unique for your user login.
A) True B) False
139)The Quality Center Document Generator enables you to create a Microsoft Word document containing a project.......™s requirements, planning, test list, test set folders, and defect tracking data.
A) True B) False
140)The Document Generator enables you to create a hard copy of the data contained in aQuality Center project.
A) True B) False
A) Requirements module B) Test Plan module
C) Test Lab module D) Defects module
E) Both A & C F) All of Above
132)Requirements -Summary Graph
A) Shows how many requirements accumulated in a Quality Center project at specific points during a period of time.
B) Shows the history of changes to specific requirement fields in a
C) Shows how many requirements are currently in a
D) Shows how many tests are currently in a
133)By default, the graph appears as a
A) pie chart, B) bar chart C) Pareto chart D) Both A & B
134)You can also use the Graph Wizard to guide you through the graph creation process.
A) True B) False
135)You can determine how information appears in the graph using the .....
A) graph toolbar. B) graph settings C) graph menu D) Both A & C
136)..... graphs enable you to create and display a dynamic graphical representation of data related to test plans and test sets.
A) Live Value B) Live Analysis C) Live Analytics D) Both A & C
137)You use Live Analysis graphs to view data that relates to a .... folder.
A) test subject B) test set C) test category D) Both A & B
138)The Live Analysis graphs that you create are unique for your user login.
A) True B) False
139)The Quality Center Document Generator enables you to create a Microsoft Word document containing a project.......™s requirements, planning, test list, test set folders, and defect tracking data.
A) True B) False
140)The Document Generator enables you to create a hard copy of the data contained in a
A) True B) False
131) F , 132) C , 133) B, 134) A , 135) A , 136) B , 137) D , 138) A , 139) A , 140) A
141)You can define a logo for the project document, and save the image so that it is available for other users in the current project. If you do not select an image, the Document Generator uses the Mercury logo in the project document.
A) True B) False
142)While specifying Requirements module data (Generating Project Documents) Microsoft Word is limited to .... header levels in the table of contents.
A) Seven B) Eight C) Nine D) Ten
143)You use the ...... pages to specify the information from the test plan tree view of the Test Plan module that should appear in the project document.
A) Subject Tree B) Subject Tests C) Subject plans D) Both A & B
144)You use the ........ pages to specify the information from the Test Lab module that should appear in the project document.
A) Tests Lab, Test Set, Tests, and Run B) Test Labs, Test Sets, Tests, and Runs
C) Test Lab, Test Gets, Tests, and Runs D) Test Lab, Test Sets, Tests, and Runs
145)You can generate a ...... that enables you to quickly see how the document will look, without all the detail included.
A) view project document B) preview project document
C) pre project document D) None
142)While specifying Requirements module data (Generating Project Documents) Microsoft Word is limited to .... header levels in the table of contents.
A) Seven B) Eight C) Nine D) Ten
143)You use the ...... pages to specify the information from the test plan tree view of the Test Plan module that should appear in the project document.
A) Subject Tree B) Subject Tests C) Subject plans D) Both A & B
144)You use the ........ pages to specify the information from the Test Lab module that should appear in the project document.
A) Tests Lab, Test Set, Tests, and Run B) Test Labs, Test Sets, Tests, and Runs
C) Test Lab, Test Gets, Tests, and Runs D) Test Lab, Test Sets, Tests, and Runs
145)You can generate a ...... that enables you to quickly see how the document will look, without all the detail included.
A) view project document B) preview project document
C) pre project document D) None
146)You can generate Excel reports that enable you to export
A) True B) False
147)You can export
A) True B) False
148)Most of the Excel Reports functionality is unavailable if you belong to a user group that has the necessary permissions.
A) True B) False
149)After you have added a report to the Excel Reports tree, you must define which project data you want to include in the report. You define this data by creating .... to extract the data.
A) Test Queries B) Lotus Queries C) Excel Macros D) SQL queries
150)To view the database type used for your project database, click the... button.
A) Database in use B) Database Type C) Get Database D) Database version
141) B , 142) C , 143) D, 144) D , 145) B , 146) A , 147) B , 148) B , 149) D , 150) B
BASICS
1)You access
A) Internet B) a corporate intranet C) Mobile Internet D) Both A & B
2)Quality Center also features a sophisticated system for tracking application
defects, enabling you to monitor defects closely from initial detection until
resolution.
A) True B) False
3)Test management withQuality Center involves five phases:
A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Run Tests.
B) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects.
C) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Analyze Tests.
D) Specify Releases, Specify Requirements, Plan Tests, Analyze Tests, Track Defects.
4)EachQuality Center project is supported by a ...... that stores project information.
A) Root folder B) Database C) Flat File D) Both B & C
5)Quality Center enables you to manage user access to a project. The ..... determines the privileges that the user has within a project.
A) QC group B) user_Account group
C) Account group D) user group
2)Quality Center also features a sophisticated system for tracking application
defects, enabling you to monitor defects closely from initial detection until
resolution.
A) True B) False
3)Test management with
A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Run Tests.
B) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects.
C) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Analyze Tests.
D) Specify Releases, Specify Requirements, Plan Tests, Analyze Tests, Track Defects.
4)Each
A) Root folder B) Database C) Flat File D) Both B & C
5)
A) QC group B) user_Account group
C) Account group D) user group
6)You can import data from...... to a
A) Word or Notepad B) Word or Wordpad
C) Word or Excel D) Word or Power Point
7)You launch Quality Center on your machine from your Web browser.
A) True B) False
8)
A) Microsoft Java 2.0 B) Microsoft Visio 13.0
C) Microsoft Visual studio 2.0 D) Microsoft .NET Framework 2.0
9)Quality Center has the following modules, which are accessible from the sidebar:
A) Releases, Requirements, Test Plan, Test Lab, Defects, Analysis
B) Releases, Requirements, Test Plan, Test Lab, Defects, Business Components
C) Releases, Requirements, Test Plan, Test Lab, Defects, Analysis
D) Releases, Requirements, Test Plan, Test Lab, Defects
10)When you customize your project, you can instruct Quality Center to preserve a log of values for the system and user fields in your Requirement, Test, Test Set, Test Instance, and Defect entities.
A) True B) False
11)The ..... can send messages to users connected to
A) site administer B) site Controller
C) site Analyser D) site administrator
12)Quality Center organizes and displays data in ......:
A) grids B) trees C) Folders D) Both A & B
13)You can no longer customize data by specifying the order in which columns appear,and by changing column size.
A) True B) False
14)You can filter
the criteria that you define.
A) True B) False
15)When defining a filter, you can also include a cross filter. This is an advanced
....... on an associated item such as requirements, tests, test sets, or
defects.
A) Secondary filter B) Primary filter
C) cross filter D) Second filter
16)By default, records appear in
A) Increasing order B) Decreasing order
C) order in which they were added. D) order in which they were deleted.
17)You cannot copy and paste the filter, sort, and group by settings to and from the
Clipboard.
A) True B) False
18)You can use text search to search for records in predefined fields of the ........
A) Requirements, Test Plan, and Defects modules.
B) Releases, Test Plan, and Defects modules.
C) Requirements and Defects modules.
D) Requirements, Execute Tests, and Defects modules.
19)If you have defined filter conditions for a module, you can restrict the search to the filtered records, or you can search all records in the module
A) True B) False
20)Text search is only available if it has been enabled for the project.
A) True B) False
21)You can export the data in a grid as a ......
A) text file, Microsoft Excel, Microsoft Word, or HTML document.
B) text file, Microsoft Excel, Microsoft Word
C) text file, Microsoft Excel, or HTML document.
D) Microsoft Excel, Microsoft Word, or HTML document.
22)When a requirement, test, or defect changes,
A) True B) False
23)A ..... indicates that the alert is new. A gray flag indicates that the alert has already been read.
A) Green flag B) Pink flag
C) red flag D) Blue flag
24)Quality Center enables you to add your own alerts, in addition to automatic traceability notifications. You can use ..... flags to remind yourself to follow up on something.
A) Alert Me B) follow up C) follow Me D) follow
25)Throughout the testing process, you can add attachments to help illustrate your work.
A) True B) False
26)You can use a Uniform Resource Locator (URL) to a
A) True B) False
27)A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.
A) True B) False
28)A ....... is a view of a
A) Personal view B) My view
C) favorite view D) fav view
29)By default, Quality Center displays the four most recently used views on the Favorites menu. You can define the number of views displayed on the menu by setting the ....... parameter in the Site Configuration tab in Site Administration.
A) FAVORITES_DEPTH B) FAVORITES-DEPTH
C) FAVORITE_DEPTH D) FAVORITE_DEPTHS
30)You save favorite views in either a .... folder or a ..... folder. Views in a
.... folder are accessible to all users. Views in a ..... folder are accessible only to the user who created them.
A) public, private, public, private B) Root, Base, Root, Base,
C) locked, unlocked, locked, unlocked D) Both B & C
1) D , 2) A , 3) B, 4) B , 5) D , 6) C , 7) A , 8) D , 9) B , 10) A, 11) D , 12) D, 13) B, 14) A, 15) C, 16) C, 17 B, 18) A, 19) A, 20) A, 21) A, 22) A, 23) C, 24) B, 25) A, 26) A, 27) A, 28) C, 29) A, 30) A
Release Management
1)You begin the application testing process by defining a releases tree in the.......
A) Requirements module B) Releases module
C) Plan Tests module D) Either B or C
2)Releases tree enables the modeling of upcoming releases within a hierarchical tree structure.
A) True B) False
3)A release represents a ..... in one or more applications that willbe available for distribution at the same time.
A) group of releases B) group of changes
C) group of defects D) group of requests
4)After defining the release, a QA manager defines ...... A ..... is a set of Development and quality assurance efforts performed to achieve a common goal based on the release timeline.
A) cycles, cycle B) Tries, Try C) Priorities, Priority D) Files, File
5)After defining the releases tree, the QA manager defines and reviews the........ in the Requirements module and assigns them to releases andcycles.
A) Plans B) groups of plans C) upcoming modules D) requirements
6)After the QA manager assigns requirements, the QA team leader assigns each..... folder in the Test Lab module to a cycle.
A) test sets B) test set C) tests set D) testing set
7)A ...... is a group of testinstances in aQuality Center project designed to achieve specific test goals.
C) Plan Tests module D) Either B or C
2)Releases tree enables the modeling of upcoming releases within a hierarchical tree structure.
A) True B) False
3)A release represents a ..... in one or more applications that willbe available for distribution at the same time.
A) group of releases B) group of changes
C) group of defects D) group of requests
4)After defining the release, a QA manager defines ...... A ..... is a set of Development and quality assurance efforts performed to achieve a common goal based on the release timeline.
A) cycles, cycle B) Tries, Try C) Priorities, Priority D) Files, File
5)After defining the releases tree, the QA manager defines and reviews the........ in the Requirements module and assigns them to releases andcycles.
A) Plans B) groups of plans C) upcoming modules D) requirements
6)After the QA manager assigns requirements, the QA team leader assigns each..... folder in the Test Lab module to a cycle.
A) test sets B) test set C) tests set D) testing set
7)A ...... is a group of testinstances in a
A) test sets B) test set C) tests set D) testing set
8)A defect can be submitted to aQuality Center project from any module atany stage of the testing process.
A) True B) False
9)While reviewing and deciding which new defects need to be fixed, the QAmanager assigns them to the appropriate ..........
A) release and cycle B) cycle and release
C) defect and cycle D) cycle and defect
10)The QA manager cannot track the progress of the testing process in real time by analyzing the releases tree and ensuring that it matches the release goals.
A) True B) False
11)In the Progress tab, in the Coverage Progress graph, the Planned coverage curve below the Assigned requirements curve indicates the percentage of requirements that are ..... Throughout the release.
A) Run B) covered C) passed D) assigned
12) The ....... helps you draw conclusions quickly and see the number of defects submitted over the course of a release or cycle.
8)A defect can be submitted to a
A) True B) False
9)While reviewing and deciding which new defects need to be fixed, the QAmanager assigns them to the appropriate ..........
A) release and cycle B) cycle and release
C) defect and cycle D) cycle and defect
10)The QA manager cannot track the progress of the testing process in real time by analyzing the releases tree and ensuring that it matches the release goals.
A) True B) False
11)In the Progress tab, in the Coverage Progress graph, the Planned coverage curve below the Assigned requirements curve indicates the percentage of requirements that are ..... Throughout the release.
A) Run B) covered C) passed D) assigned
12) The ....... helps you draw conclusions quickly and see the number of defects submitted over the course of a release or cycle.
A) Details tab B) Attachments tab C) Progress tab D) Quality tab
13) The defects are categorized by ...... in terms of how they impact system operation.
A) Priority B) severity
13) The defects are categorized by ...... in terms of how they impact system operation.
A) Priority B) severity
14) You can move a release folder or a release to a different location in the releases tree.
A) True B) False
15) The Releases root folder can also be moved.
A) True B) False
16) You can create a duplicate of a cycle within the same release.
A) True B) False
17) Deleting a release folder, release, or cycle, does not unassigns the associated requirements, test set folders, and defects.
A) True B) False
18) You can also move a release folder or a release to a new location in the releases tree by dragging it.
A) True B) False
1) B , 2) A , 3) B, 4) A , 5) D , 6) B , 7) B , 8) A , 9) A , 10) B, 11) B , 12) D, 13) B, 14) A, 15) B, 16) A, 17 B, 18) A
Requirements Specification
1) After you define a releases tree in the Releases module, you continue the
application testing process by specifying........
A) Requirements B) Releases C) Plan Tests D) Either B or A
2) Requirement topics are recorded in the Requirements module by creating a requirements......
A) Graph B) tree C) Path D) plan
3) The requirements ....... is a graphical representation of your requirements specification, displaying the hierarchical relationship between different requirements.
A) Graph B) plan C) Path D) tree
4) For each requirement topic, a QA tester creates a list of ....... in the requirements tree.
A) Detailed requirements B) detailed specifications
C) detailed plans D) detailed sub-requirements
5) Each requirement in the tree is described in detail and cannot include any relevant attachments.
A) True B) False
6) After defining your requirements, you can add traceability between the requirements. When analyzing the impact of a change proposed in a specific requirement ... shows the other requirements that the change might affect.
A) Equality B) link-ability C) traceability D) cross-links
7) QA managers assign the requirements to releases and cycles in the releases tree in the Releases module.
A) True B) False
8) The assigned requirements are then used as a basis for the test plan in the Test Plan module. The tests you create during the test plan phase are then linked to these requirements to create......
A) linkages B) linked-requirements
C) requirements plan D) coverage
9)QA managers review the requirements, they change a requirement from a Not Reviewed status to a ..... Status once it is approved.
A) Passed B) Reviewed C) Partially reviewed D) Both B & C
10) You can also import requirements to yourQuality Center project from........
A) Microsoft Word B) Excel
C) other third-party requirement management tools D) All of above
11)In the Requirements Tree view, Indicator columns indicates that the specified requirement has
A) attachments, linked defects, alerts, and follow up flags
B) attachments, linked defects, alerts
C) attachments, linked defects and follow up flags
D) linked defects, alerts, and follow up flags
12)To find a specific requirement by ReqID in the Requirements Tree view, choose ............., and enter the requirement ID.
A) Requirements > Find Requirement
B) Requirements > Go to Requirement
C) Requirements > Get Requirement
D) Requirements > Display Requirement
13) The Requirements ...... view enables you to display requirements in a flat
non-hierarchical view. Each line in the.... displays a separate requirement.
A) File, file B) hierarchical, hierarchy
c) Grid, Grid D) Both B & C
14) The ... Analysis view enables you to analyze the breakdown of child requirements according to test..... Status.
A) Plan B) Requirement C) Coverage D) Task
15) You can access the Requirements menu bar from the Requirements module by pressing the shortcut key....
A) F6 B) F7 C) F8 D) F9
16) The Requirement module field Direct Cover Status means
application testing process by specifying........
A) Requirements B) Releases C) Plan Tests D) Either B or A
2) Requirement topics are recorded in the Requirements module by creating a requirements......
A) Graph B) tree C) Path D) plan
3) The requirements ....... is a graphical representation of your requirements specification, displaying the hierarchical relationship between different requirements.
A) Graph B) plan C) Path D) tree
4) For each requirement topic, a QA tester creates a list of ....... in the requirements tree.
A) Detailed requirements B) detailed specifications
C) detailed plans D) detailed sub-requirements
5) Each requirement in the tree is described in detail and cannot include any relevant attachments.
A) True B) False
6) After defining your requirements, you can add traceability between the requirements. When analyzing the impact of a change proposed in a specific requirement ... shows the other requirements that the change might affect.
A) Equality B) link-ability C) traceability D) cross-links
7) QA managers assign the requirements to releases and cycles in the releases tree in the Releases module.
A) True B) False
8) The assigned requirements are then used as a basis for the test plan in the Test Plan module. The tests you create during the test plan phase are then linked to these requirements to create......
A) linkages B) linked-requirements
C) requirements plan D) coverage
9)QA managers review the requirements, they change a requirement from a Not Reviewed status to a ..... Status once it is approved.
A) Passed B) Reviewed C) Partially reviewed D) Both B & C
10) You can also import requirements to your
A) Microsoft Word B) Excel
C) other third-party requirement management tools D) All of above
11)In the Requirements Tree view, Indicator columns indicates that the specified requirement has
A) attachments, linked defects, alerts, and follow up flags
B) attachments, linked defects, alerts
C) attachments, linked defects and follow up flags
D) linked defects, alerts, and follow up flags
12)To find a specific requirement by ReqID in the Requirements Tree view, choose ............., and enter the requirement ID.
A) Requirements > Find Requirement
B) Requirements > Go to Requirement
C) Requirements > Get Requirement
D) Requirements > Display Requirement
13) The Requirements ...... view enables you to display requirements in a flat
non-hierarchical view. Each line in the.... displays a separate requirement.
A) File, file B) hierarchical, hierarchy
c) Grid, Grid D) Both B & C
14) The ... Analysis view enables you to analyze the breakdown of child requirements according to test..... Status.
A) Plan B) Requirement C) Coverage D) Task
15) You can access the Requirements menu bar from the Requirements module by pressing the shortcut key....
A) F6 B) F7 C) F8 D) F9
16) The Requirement module field Direct Cover Status means
A) The current status of the requirement
B) The previous status of the requirement
C) The coming status of the requirement
D) The fixed status of the requirement
17)You can add user-defined fields and change the label of any of the fields in the Requirements module.
A) True B) False
18) You start a requirements tree by adding requirements to the Requirements root folder.
A) True B) False
19) You can add, view, and edit Microsoft Word rich text from withinQuality Center , without the need to edit the text in Word.
A) True B) False
20) You cannot update your requirements directly in the requirements tree or grid, or in the Requirement Details dialog box.
A) True B) False
B) The previous status of the requirement
C) The coming status of the requirement
D) The fixed status of the requirement
17)You can add user-defined fields and change the label of any of the fields in the Requirements module.
A) True B) False
18) You start a requirements tree by adding requirements to the Requirements root folder.
A) True B) False
19) You can add, view, and edit Microsoft Word rich text from within
A) True B) False
20) You cannot update your requirements directly in the requirements tree or grid, or in the Requirement Details dialog box.
A) True B) False
21) You can search for a particular requirement in the requirements tree or in the requirements grid using the ....... command.
A) Search B) Find C) Look D) Get
22)You can send e-mail about a requirement to other users in your Quality Center project
A) True B) False
23)You cannot copy a requirement within the same project or between projects.
A) True B) False
24) Test coverage, defect linkage, and risk-based quality management data for the requirement are not copied.
A) True B) False
25) Methods you can use to create tests from requirements:
A) Convert Requirements to Tests
B) Generate a Test from Requirements.
C) Get a test from a requirement
D) Both A & B
E) Both B & C
26) Using the Requirements Traceability tab in the Requirement Details view, you can add traceability links to and from a selected requirement. ....... Links indicate requirements that affect a selected requirement. ....... Links indicate requirements that are affected by a selected requirement.
A) Trace from, Trace to B) Trace to, Trace from
C) Trace from select, Trace to select D) Trace to select, Trace from select
27)When a requirement changes,Quality Center alerts the affected requirements. The alerts can be seen by all users.
A) Search B) Find C) Look D) Get
22)You can send e-mail about a requirement to other users in your Quality Center project
A) True B) False
23)You cannot copy a requirement within the same project or between projects.
A) True B) False
24) Test coverage, defect linkage, and risk-based quality management data for the requirement are not copied.
A) True B) False
25) Methods you can use to create tests from requirements:
A) Convert Requirements to Tests
B) Generate a Test from Requirements.
C) Get a test from a requirement
D) Both A & B
E) Both B & C
26) Using the Requirements Traceability tab in the Requirement Details view, you can add traceability links to and from a selected requirement. ....... Links indicate requirements that affect a selected requirement. ....... Links indicate requirements that are affected by a selected requirement.
A) Trace from, Trace to B) Trace to, Trace from
C) Trace from select, Trace to select D) Trace to select, Trace from select
27)When a requirement changes,
A) True B) False
28) you can display traceability relationships that exist between requirements in the ...... tab. This tab contains the Trace From and Trace To grids.
A) Traceability B) Relationships
28) you can display traceability relationships that exist between requirements in the ...... tab. This tab contains the Trace From and Trace To grids.
A) Traceability B) Relationships
C) Req-traceability D) traceability-Req
29)The ...... feature enables you to calculate at which level to test each requirement, based on the nature of the requirement and the resources you have available.
A) Level-based quality management
B) Calculate-based quality management
C) risk-based quality management
D) None of above
30)You can assign or calculate the Risk Category of an assessment requirement. The Risk Category is composed of its .....
A) Business Criticality & Failure Probability
B) Business Probability & Failure Criticality
C) Priority & Severity
D) None of above
31)Quality Center defines four Testing Levels:
A) First, second, third, and fourth
B) Full, Partial, Basic, and None
C) Full, Partial, Basic, and moderate
D) Partial, Basic, moderate and Advanced
32)The ...... link displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis.
A) Missing risk assessment B) miss assessment
C) missing assessment D) exclude assessment
29)The ...... feature enables you to calculate at which level to test each requirement, based on the nature of the requirement and the resources you have available.
A) Level-based quality management
B) Calculate-based quality management
C) risk-based quality management
D) None of above
30)You can assign or calculate the Risk Category of an assessment requirement. The Risk Category is composed of its .....
A) Business Criticality & Failure Probability
B) Business Probability & Failure Criticality
C) Priority & Severity
D) None of above
31)Quality Center defines four Testing Levels:
A) First, second, third, and fourth
B) Full, Partial, Basic, and None
C) Full, Partial, Basic, and moderate
D) Partial, Basic, moderate and Advanced
32)The ...... link displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis.
A) Missing risk assessment B) miss assessment
C) missing assessment D) exclude assessment
1) A , 2) B , 3) D, 4) A , 5) B , 6) C , 7) A , 8) D , 9) B , 10) D, 11) A , 12) B, 13) C, 14) C, 15) D, 16) A, 17 A, 18) A, 19 A), 20) B,21) B,22) A,23) B,24) A ,25) D ,26) A,27) A,28) B,29) C, 30) A, 31) B, 32) C