Friday, February 18, 2011

Sample HP Quality Center (HP0-M31) Certification Questions Dump 6




41) By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the ……. parameter in the Site Configuration tab in Site Administration.   
A) EMAIL_FORMAT B) EMAIL_FORM C) MAIL_FORMAT D) QC_MAIL_FORMAT  
42) You can copy a requirement within the same project or between projects. Which of the below items are copied at the time of copying a requirement.  
A) Test coverage. B) defect linkage. C) risk-based quality management data D) All of above 
E) None of above  
43) You can also move a requirement to a new location in the requirements tree by dragging it..   A) True B) False   
44) You can delete a requirement from the Requirements module. Deleting a requirement does not delete its child requirements, tests coverage, requirement traceability links, and defects linkage..  
A)True B) False  
45) There are two methods you can use to create tests from requirements:  
A) Convert Requirements to Tests & Generate a Test from Requirements B) Convert Requirements to Tests & Convert a Test from Requirements   
C) Convert Requirements to Tests & Generate a Requirement from Tests   
D) Convert a Test from Requirement & Generate Requirements to Tests     
46) When analyzing the impact of a change proposed in a specific requirement, the traceability links indicate the other ...... that the change might affect. A) tests B) requirements C) tests & requirements D) None  
47) ...... links indicate requirements that affect a selected requirement. .....links indicate requirements that are affected by a selected requirement.  
A) Trace from, Trace to B) Trace to, Trace from C) From trace, To trace D) None of above  
48) When a requirement changes, Quality Center alerts the affected requirements. The alerts can be seen by.......   A) Author of the requirement B) users authorized by the Author of the requirement 
C) all users D) Administrator    
49) While defining Traceability Relationships, You cannot add a requirement traceability link by dragging a requirement from the requirements tree to the appropriate grid..  
A) True B) False  
50) While viewing Traceability Impact, the Impact Analysis tab helps you understand the many associations and dependencies that exist between the ........ by displaying them in a hierarchical tree structure.   A) Tests B) Requirements C) Both D) None
Answers: 41) C, 42) E, 43) A, 44) B, 45) A, 46) B, 47) A, 48) C, 49) B, 50) B

Sample HP Quality Center (HP0-M31) Certification Questions Dump 5

31) QA Manager changes a requirement from a ……….. status to a Reviewed status once it is approved.   
A) Released B) Tested C) Not reviewed D) None of these  
32) You can also import requirements to your Quality Center project from Microsoft Word, Excel, or other third-party requirement management tools. To import requirements, you must first install the appropriate………   A) HP Third Party add-in. B) HP Quality Center add-in. C) HP Quality Center D) HP Quality Center License  
33) The Requirements Grid view enables you to display requirements in a …………….view.  A) Flat B) Hierarchical C) Flat-hierarchical D) Flat non-hierarchical   
34) The …………view enables you to analyze the breakdown of child requirements according to test coverage status. A) Coverage Analysis B) Coverage Requirements C) Coverage D) Coverage Tests  
35) You can access the Requirements menu bar from the Requirements module by pressing the shortcut key …….  
A) F1 B) F9 C) Ctrl + R D) Alt + R     
36) You can use the ………to restrict and dynamically change the fields and values in the Requirements module.   
A) Script Edit B) Scriptor Editor C) Script Editor D) Script Editing  
37) The Requirements module enables you to define and manage your……...  
A) requirements B) All requirements C) some requirements D) Tedious requirements  
38) You can rename or delete Requirements root folder.   A) true B) False  
39) You can search for a particular requirement in the requirements tree or in the requirements grid using the …….command.  
A) Search B) Find C) Search All D) Find All  
40) You can replace field values in the requirements tree or in the requirements grid using the …….command.      
A) Replace B) Replace All C) Find & Replace D) Replace & Find
Answers : 31) C, 32) B, 33) D, 34) A, 35) B, 36) C, 37) A, 38) B, 39) B, 40) A

Sample HP Quality Center (HP0-M31) Certification Questions Dump 4


21) You can view a list of alerts for a ………… entity.
A) A test in the test plan tree or Test Grid  
B) A test instance in the Execution Grid C) None of above   
D) Both A & B   

22) A red flag indicates that the alert is.........  
A) New  B) Old C) Follow up D) Urgent  

23) A gray flag indicates that the alert ………..  
A) New B) has already been read C) Follow up D) Urgent     

24) A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.  
A) True B) False  

25) Quality Center assigns the image a unique file name with a ..... extension.  
A) .jpeg B) .gif C) .doc D) .jpg  

26) A ………..is a view of a Quality Center window with the settings you apply to it.  
A) Personal View B) My view C) Favorite View D) My QC View  

27) You save favorite views in ........   
A) Favorite folder B) Personal folder C) Both A & B D) Public & Private folder  

28) You can define the number of views displayed on the menu by setting the …………….. parameter in the Site Configuration tab in Site Administration.      
A) favorites B) favorites_Depth C) favorites_view D) favorites_Path  

29) The requirements specification workflow consists of the following:  
A) Define Testing Scope, Create Requirements, Detail Requirements, Assign to Releases, Analyze Requirements B) Define Testing Scope, Detail Requirements, Create Requirements, Assign to Releases, Analyze Requirements 
C) Define Testing Scope, Create Requirements, Detail Requirements, Analyze Requirements, Assign to Release
D) Define Testing Scope, Create Requirements, Analyze Requirements, Detail Requirements, Assign to Releases  

30) Requirement topics are recorded in the Requirements module by creating a  
A) Requirements cycle B) Requirements tree C) Requirements plan D) Requirements module
Answers: 21) D, 22) A, 23) B, 24) A, 25) D, 26) C, 27) D, 28) B, 29) A, 30) B



Sample HP Quality Center (HP0-M31) Certification Questions Dump 3


11) By default, records appear in Quality Center in the  
A) Increasing Order B) Decreasing Order C) Order in which they were added D) None of these  

12) You can save filter and sort information as a favorite view and then load it as needed.  

A) True B) False  


13) You can copy and paste the filter, sort, and group by settings to another project.  
A) True   B) False


14) You can also share the settings (filter, sort, and group by settings) with another user by pasting them to an e-mail or a text file.      
A) True B) False  


15) When you use text search, the search ignores  
A) articles (a, an, the) B) coordinate conjunctions (and, but, for, nor, or) C) Boolean operators (and, or, not, if, or, then) D) All of above  


16) You can export the data in a grid as a   
A) text file, B) Microsoft Excel worksheet, C) Microsoft Word document, or D) HTML document. E) All of above  


17)  …….. alerting functions availabl in Quality Center  
A) Three   B) Four C) Two  D) Five  


18) The alerting functions in Quality Center are:  
A) Automatic notification alerts, Follow up alerts   
B) Email alerts, Automatic notification alerts, Follow up alerts   
C) Defect alerts, Email alerts, Automatic notification alerts, Follow up alerts   
D) Final alerts, Email alerts, Automatic notification alerts, Follow up alerts  


19) You can create traceability links between ……….. in the Requirements module.  
A) Requirements B) Test Case C) Tests D) Defects  


20) You can associate a test instance with a defect. This is performed by creating ………..in the Test Plan module, or by adding a defect during a manual test run.      
A) Linked Tests B) Linked Defects C) Linked Errors D) Linked Data    



Answers: 11) C, 12) A, 13) A, 14) B, 15) D, 16) E, 17) C, 18) A, 19) A, 20) B

Sample HP Quality Center (HP0-M31) Certification Questions Dump 2


1) Test management with   Quality Center  involves …. Phases.  
A) Four B) Five C) Six D) Seven  

2) The phases of Test management with   Quality Center  in order are:  
A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects
B) Specify Requirements, Specify Releases, Plan Tests, Execute Tests, Track Defects
C) Specify Requirements, Plan Tests, Specify Releases, Execute Tests, Track Defects
D) Specify Releases, Specify Requirements, Plan Tests, Track Defects, Execute Tests  
3) By creating a list of authorized users and assigning each user a password and user group, you control the kinds of additions and modifications each user makes to the project.  
A) True B) False  
4) The …….determines the privileges that the user has within a project.  
A) User ID B) User Name C) User group D) User SID  
5) You can import data from Word or Excel to a Quality Center project.  
A) True B) False   
6) Quality  Center  9.2 prompts you to install Microsoft .NET ...... if it is not already installed on your machine.  
A) Framework 2.0 B) Framework 1.0 C) Framework 3.0 D) Framework 4.0  
7) When you connect to a project, the Quality Center main window opens and displays the module in which you were last working.
A) True B) False  

8) The ….can change and override a user’s properties or password.  
A) Global Administrator B) Site Administrator C) Administrator D) QC Administrator  

9) You can filter Quality Center data to display only those records that meet the criteria that you define. How many filters can you define  
A) Single item as a filter B) Two items as a filter C) Multiple items as filter D) Five items as filter  

10) In the test plan tree, you can define the ……filter for associated test sets as “Open”. This ensures that only tests that belong to an open test set are displayed.
A) Double B) Twice C) Cross D) Multiple


Answers: 1) B, 2) A, 3) A, 4) C, 5) A, 6) A, 7) A, 8) B, 9) C, 10) C

Sample HP Quality Center (HP0-M31) Certification Questions Dump 1

QUESTION 1

What web client can be used with Quality Center 10.0?
A. Netscape
B. Safari
C. Firefox
D. Internet Explorer
Answer: D

QUESTION 2
Which term describes the main function of Quality Center?
A. test cases
B. repository
C. load test
D. defects
Answer: B

QUESTION 3
What database can be used with Quality Center 10.0? Select two.
A. Access
B. Sybase
C. Microsoft SQL Server
D. Paradox
E. Oracle
Answer: C, E

QUESTION 4
What HP functional testing tools integrate with Quality Center? (Select two.)
A. HP OpenView
B. HP WinRunner
C. HP QuickTest Professional
D. HP LoadRunner
E. HP Change Control Management
Answer: B, C

QUESTION 5
Which component provides an executive-level view of the entire quality process?
A. Quality Center Foundation
B. Business Process Insight
C. Service Test Component
D. Quality Center Dashboard
Answer: D

QUESTION 6
When designing test steps it is important to ensure that all aspects of the application are tested.
When writing test steps, what are two things that should be done to ensure clear and accurate
steps? (Select two.)
A. specify all actual results
B. use parameters in the step names
C. specify pass and fail conditions for the step
D. use the numbering system for the step names
E. use consistent terminology throughout the test
Answer: C, E

QUESTION 7
Where can you link tests to requirements?
A. from the Test Lab module
B. from the Requirements module
C. on the test details page (Test Plan)
D. on the attachments page (Test Plan)
Answer: B

QUESTION 8
When a called test has parameters, when can you assign values to the parameters?
A. values are assigned from within the calling test
B. values must be assigned when the test is executed
C. values are assigned during test design or execution
D. values must be assigned when the test is called, during test design
Answer: C

QUESTION 9
What are the steps, in the correct order, to convert a requirement to a test?
A. make changes to the automatic conversion, select an automatic method
B. select convert to test, select the destination path, convert to automated test
C. select an automatic method, make changes to the automatic conversion, select the destination
subject path
D. select the destination subject path, select an automatic method, make changes to the
automatic conversion
Answer: C

QUESTION 10
How is a test configured as a template test?
A. The test type chosen must be MANUAL-TEMPLATE
B. The first step in the test must be named template test
C. Right-click on the test name and choose Template Test
D. During test planning, mark the checkbox, under details, labeled template Test
Answer: C


(Lets Read More)


Thursday, February 17, 2011

Procedure to be followed to get HP Learner ID


The following link will guide you through the procedure to be followed to get your HP Learner ID.


Registration Process - HP Learner ID

If you face any issues in getting your HP Learner ID, send an email to premium.support@hp.com
You get a prompt response from them though it takes 2 to 3 days. 

HP QC Certification (HP0-M31) - Points to Remember


                                               IMPORTANT POINTS

1)  Quality Center Editions: The availability of each feature depends on your Quality Center edition — Starter, Enterprise or Premier.
2)     To download files to your machine, you must log in with administrator privileges. For more information on the minimum permissions required to install client components, refer to the HP Quality Center Installation Guide.
3)     If file downloads are prohibited through your browser, you can install these files from the HP Quality Center Client Side Setup Add-in on the HP Quality Center Add-in page. For more information on add-ins, refer to the HP Quality Center Installation Guide.
4)     Quality Center prompts you to install Microsoft .NET Framework 2.0 if it is not already installed on your machine. To perform the installation, follow the instructions in the Software Update Installation Wizard (if Windows Installer 3.1 is not installed) and the Microsoft .NET Framework 2.0 Setup.
5)     Resetting your password is unavailable in either of the following situations:
6)     It is deactivated by the PASSWORD_RESET_DISABLE Site Configuration
7)     Parameter or LDAP authentication is enabled.
8)     Available Quality Center functionality may depend on how your site or project administrator has configured your Quality Center project.
9)     Quality Center Editions: The availability of each module and feature depends on the Quality Center edition you have — Starter, Enterprise or Premier. For more information, see Appendix C, “Quality Center Editions”.
10) You can navigate between the modules using shortcut keys. For a list of shortcut keys, see Appendix B, “Quality Center Keyboard Shortcuts.”


(Lets Read More)

HP0-M31 Quality Center Certification Preparation 7 - Libraries Module


LIBRARIES

1)      Quality Center Premier Edition includes all Libraries module functionality and Quality Center Enterprise Edition includes some functionality. This module is not available with Quality Center Starter Edition.
2)      Libraries tree. Displays libraries and baselines in a hierarchical tree structure.
3)      Details tab. Describes the library folder, library, or baseline currently selected in the libraries tree.
4)      The Entities pane lists the root folders associated with the library.
5)      Quality Center Premier Edition: The following additional tabs are available
for importing libraries:
a)      Imported By tab. Lists the projects that imported the selected library
b)      Imported From tab. Displays details about the library from which the
currently selected library was imported.
6)      The Libraries menu contains commands that enable you to add library folders, libraries and baselines. It also contains a command enabling you to compare libraries and baselines.
7)      Quality Center Premier Edition: Import Library. Imports a new library and adds it to the libraries tree.
8)      Create Baseline. Creates a baseline and adds it to the libraries tree.
9)      Compare To. Compares the currently selected library or baseline with other libraries or baselines.
10)   Delete. Deletes the selected item. Deleting a library folder also deletes its libraries and baselines. Deleting a library also deletes its baselines. 
(Lets read more)

HP0-M31 Quality Center Certification Preparation 6 - Dashboard Module


ANALYSIS
1)      In the Dashboard module, you create, view and manage graphs, standard reports, and Excel reports, for analyzing Quality Center data. You also create dashboard pages that display multiple graphs side-by-side. You define analysis items — graphs, standard reports, Excel reports — and dashboard pages using the Dashboard module.
2)      The Dashboard module includes two tabs: The Analysis View tab and the Dashboard View tab.
3)      The Analysis View tab contains a tree in which you organize all of your analysis items. Analysis items can be any of the following analysis types: graphs, standard reports, and Excel reports.
4)      You create graphs, standard reports, and Excel reports in the Analysis View tab of the Dashboard module.
5)      The Dashboard View tab contains a tree in which you organize dashboard pages. In Dashboard pages you arrange multiple graphs that you created in the analysis tree, and display them in a single view.
6)      You create dashboard pages in the Dashboard View tab of the Dashboard module.
7)      Analysis and Dashboard trees. Structures of private and public folders that contain your analysis items and dashboard pages.
8)      Each tree consists of Private and Public root folders. Under each root folder you develop separate trees. Analysis items or dashboard pages that you create in a public folder are accessible to all users. Analysis items or dashboard pages that you create in a private folder are accessible only to the user who created them. Public dashboard pages can include only public graphs. 
9)      Analysis items and dashboard pages in public folders may show different results for different users, depending on the data hiding definitions for the user group.
10)   The analysis or dashboard folder names cannot include the following characters: \ ^ * 
(Lets read more)

HP0-M31 Quality Center Certification Preparation 5 - Defects Module


DEFECTS
1)      Locating and repairing application defects efficiently is essential to the development process. Defects can be detected and added to your Quality Center project by users during all stages of the application management process. Using the Quality Center Defects module, you can report design flaws in your application, and track data derived from defect records.
2)      Fields related to release management are not available in the Defects module if you are working with the Starter Edition.
3)      The defects tracking workflow consists of the following: Add Defects, Review New Defects, Repair Open Defects, Test New Build, Analyze Defect Data.
4)      You can associate the new defect with the cycle and release in which it was detected.
5)      You can link the new defect with the test you ran, for future reference. You can also link defects to other Quality Center entities, such as requirements, tests and other defects. You can also view, update, and analyze defects in the project.
6)      Review all new defects in the project and decide which ones to fix. This task is usually performed by the project manager. Change the status of a new defect to Open, and assign it to a member of the development team.
7)      While reviewing new defects, if duplicate defects appear in the project, change their status to either Closed or Rejected, or delete them from the project.
8)      Fix the Open defects. This involves identifying the cause of the defects, and modifying and rebuilding the application. These tasks are performed by application developers. When a defect is repaired, assign it the status Fixed.
9)      Run tests on the new build of the application. If a defect does not recur, assign it the status Closed. If a defect is detected again, assign it the status Reopen, and return to the previous stage. This task is usually performed by the quality assurance manager or project manager.
10)   View data from defect reports to see how many defects were resolved, and how many still remain open. As you work, you can save settings that are helpful in the defect-tracking process, and reload them as needed. 
(Lets read more)

HP0-M31 Quality Center Certification Preparation 4 - Test Lab Module


TEST EXECUTION
  1. Fields and functionality related to release management and baselining are not available in the Test Lab module if you are working with the Starter Edition.
  2. We run the manual and automated tests in your project in order to locate defects and assess quality.
  3. Executing tests consists of the following: Create Test Sets, Schedule Runs, Run Tests Manually, Run Tests Automatically, Analyze Test Results.
  4. You can organize test execution by creating test sets.
  5. A test set is a group of tests in a Quality Center project designed to achieve specific testing goals.
  6. A test sets tree enables you to organize your application management process by grouping test sets in folders and organizing them in different hierarchical levels in the Test Lab module.              
  7. The test sets tree can contain folders at the main level and subfolders below the main folders. For each folder in the test sets tree, you define a test set and add test instances to it. You start a test sets tree by adding a folder to the Root folder.
  8. After you have created test sets, you assign test set folders to cycles defined in the releases tree in the Releases module.
  9. A cycle represents a development and QA cycle based on the project timeline.
  10. Quality Center enables you to control the execution of tests in a test set. You can set conditions, and schedule the date and time for executing your tests. You can also set the sequence in which to execute the tests. 
  11. (Lets read more)

HP0-M31 Quality Center Certification Preparation 3 - Test Plan Module

TEST PLAN
  1. Developing a clear and concise test plan is fundamental to successful application testing. A good test plan enables you to assess the quality of your application at any point in the application management process.
  2. Developing a test plan consists of the following: Define Testing Strategy, Define Test Subjects, Design Tests, Create Requirements Coverage, Design Test Steps, Automate Tests, Analyze Test Plan, Establish Baseline.
  3. The test plan tree is a graphical representation of your test plan. It is a hierarchical list of tests organized according to topic, which describes the set of tests you will implement in order to meet your quality requirements.
  4. You can link a test to specific defects.
  5. You can include parameters in your manual tests. This enables you to run the same test repeatedly and assign the parameters different values.
  6. Link each test in the test plan tree with a requirement or requirements in the requirements tree. By defining requirements coverage for a test, you can keep track of the relationship between the tests in your test plan and your original requirements.
  7. For manual tests you define steps, execute them on your application, and record the results of each step. Use manual tests in cases where the test requires a response by the tester. Manual tests include usability tests, onetime tests, tests that need to be run immediately, tests requiring knowledge of the application, and tests without predictable results.
  8. You can include a step that calls another manual test. This is useful if you have common steps that you want to perform as part of other tests.
  9. Automating a test allows unattended execution of the test at high speed. It also makes the test reusable and repeatable.
  10. We automate functional, benchmark, unit, stress and load tests, as well as tests requiring detailed information about applications. 
  11. (Lets read more)

HP0-M31 Quality Center Certification Preparation 2 - Requirements Module

REQUIREMENTS

·         Requirements describe in detail what needs to be solved or achieved to meet the objectives of your application under development.
·         Not all fields and functionality in the Requirements module are available if you are working with the Starter Edition.
·         You use the requirements scope to determine the overall requirements for the application under development. You then define different groups of requirements based either on requirement type or functional area.  Requirement groups are recorded in the Requirements module by creating a requirements tree. The requirements tree is a graphical representation of your requirements specification, displaying the hierarchical relationship between different requirements.
·         For each requirement group, you create a list of detailed requirements in the requirements tree.
·         Each requirement in the tree is described in detail and can include any relevant attachments. You then assign the requirement a priority level which can be taken into consideration when creating the test plan.
·         After defining your requirements, you can add traceability between the requirements. When analyzing the impact of a change proposed in a specific requirement, traceability shows the other requirements that the change might affect.
(    Lets read more)

HP0-M31 QC Certification Preparation 1 - Releases Module

1)      The Releases module is available for Quality Center Enterprise Edition and Quality Center Premier Edition.
2)      The foundation of the Releases module is the releases tree. This tree enables the modeling of upcoming releases within a hierarchical tree structure.
3)      A release represents a group of changes in one or more applications that will be available for distribution at the same time. After defining the release, you define cycles.
4)      A cycle is a set of development and quality assurance efforts performed to achieve a common goal based on the release timeline.
5)      After defining the releases tree, you define and review the requirements in the Requirements module and assign them to releases and cycles.
6)      Requirements describe in detail your application needs.
7)      Requirements are used as a basis for the test plan in the Test Plan module. The tests you create during the test plan phase should cover these requirements.
8)      After assigning requirements to releases and cycles, you assign each test set folder in the Test Lab module to a cycle.
9)      A test set is a group of test instances in a Quality Center project designed to achieve specific test goals.
10)   If an application flaw is detected while running a test set, you can submit a defect. Quality Center automatically creates a link between the test run, associated release and cycle, and the new defect.
11)   While reviewing and deciding which new defects need to be fixed, they can be assigned to the appropriate target release and cycle.
(Let us read more)

Introduction to the blog about Quality Center and QTP Certification

It takes a month at least to read the entire Quality Center 10.0 User Guide.
You can get the gist here module wise (a quick reference guide) and you can get ready to take the certification exam by preparing in a week's time.

Hope you all make full use of this and give your inputs and QC /QTP tips or exam dumps or preparation material to this blog so that we can make this as a one-stop place for QC/QTP Preparation and certification.